This
ASATI super Sports Dome facility is now substantially approved for
construction. This “first of its kind” world class
Sports Dome will start construction by October or November 2009.
ASATI is now under contract for the engineering and manufacturing
of the dome and for all the site construction required to provide
a turnkey operating facility for the investors of this project.
The
land has been acquired and the site excavation is completed; all
approvals are in final stage for building this “first of its
kind,” year round, climate controlled baseball and multi-field
Sports Dome.
The names
of the high profiled sports professionals involved with this year
round sports and training facility will soon be revealed.
This
Sports Dome will not only be the “first of its kind” in the
air structure industry, it will dwarf all air supported Sports
Domes in existence worldwide.
ASATI STRUCTURE 400 FEET
WIDE BY 670 FEET
LONG BY 120 FEET
HIGH
The
building department and the Fire Marshalls of Connecticut now
approve this huge project. Investor’s
financial commitments are in place and the site is now graded for
construction. We expect to start the air structure site
construction on October 2009, install the structure mechanicals in
January or February 2010, followed up with 260,000 square feet of
grass by March 2010, and have the dome up and ready to play April
2010 or sooner, depending on winter weather conditions.
The
multi Sports Dome facility with 4 indoor baseball fields and 4
indoor soccer fields that convert to full size lacrosse and other
multi-sports field activities, including a 10,000 square foot
indoor clubhouse with a full management service center, locker
rooms, classroom sports training center, 12 one-on-one training
batting cages and a upper roof grandstands constructed above the
clubhouse for viewing the entire sports facility and activities
without obstructions.
DETAILS OF THE MAJOR
MATERIALS AND EQUIPMENT REQUIRED
FOR THIS BASEBALL
& MULTI SPORTS FACILITY
√ 432,000 sq. Ft. (10 acres), 32,000 yards
of 32 oz/yard of Tedlar/PVC, UV and flame resistance structural
outer fabric. This equates to approximately 10 acres of structural fabric.
The outer structural fabric envelope will weigh 96,000 lbs.
(43,000 tons). The
fabric will be produced to ASATI specifications and provide over
1000 foot candles of light transmission into the dome from the
natural outside daylight; even on a cloudy day, this 268,000sq.
Ft.
Sports
Dome will be operated without the need of turning on one watt of
its interior lighting system. The only time interior lighting will
be turned on is after sundown. The fabric envelope fabric meets
NFPA 701 fire resistance code requirements. Supported with federal
fire test certifications.
√ 432,000 sq. Ft. Of interior pvc, UV and
flame resistance rip-stop thermo liner will
be welded to the exterior structural envelope for providing the
insulated air space between the outer envelope and the interior
insulation liner to reduce the cost of heating and air
conditioning, while allowing the natural light transmission to
travel thru the fabrics for providing natural lighted playing
fields. This thermo liner fabric will add an additional 42,000 lbs
(21,000 tons). The fabric will be produced to ASATI color and
specifications, manufactured with extra sized rip stop fibers to
prevent tear propagation. The thermo liner fabric will meet NFPA
701 fire resistance code requirements, and supported with federal
fire test certifications.
√ 175,000 feet ½” coated to 9/16” of
PVC UV resistant coated hot dipped galvanized cable. This
cable will be pre-manufactured into a cable net system to conform
to Donato Fraioli bias cable net patents.
This cable net system encapsulates the entire air structure
envelope to allow the structure to be pressurized to support the
maximum wind load and snow load called for by local code
standards, without the reliance of melting the snow or requiring
manual removal of snow from the roof. The high pressure needed for
supporting these load conditions could never be satisfied by any
other stress relief cabling system. To appreciate the abilities of
ASATI’s unique cable, the net system allows higher pressure
without causing strain on the fabric while supporting a design
roof snow load of 2,700,000 lbs. = (13,550 tons).
√ 400,000
watts of Daft
Hanglite’s ® each 1000 watt Hanglite® fixture will be hung from the interior roof and
walls to provide a even distribution of 65 to 70 foot candles of
indirect non-glare quality sports lighting onto all the sports
fields. The Daft Hanglite ® system, developed and introduced to
the air structure industry in mid 1980’s by Donato Fraioli Jr,
has become the worldwide standard of the industry and is installed
in sports facilities such as the NY Jets, NY Giants, Miami
Dolphins and many more prestigious sports facilities around the
world. The Daft Hanglite® system has become the choice of
architects for high profiled sports facilities.
√ 6 HVAC units supplying a total of
15,000,000 btu’s of heat and 900 tons of air conditioning will
be supplied to provide 65oF degree rise above outside
winter cold temperature. In
the summer, the cooling system will maintain a 15oF
drop from the outside ambient temperature. These units will have
automatic controls to maintain controlled temperatures throughout
the facility and to allow the structure to operate year round in a
comfort-controlled environment.
The built in inflation units will provide the air changes
to meet Sports facilities requirements. The air volume of this
structure is 17,500,000 cubic feet of air. The inflation blower
units will provide the cfm to produce in full air change per hour
to provide a very healthy clean air environment. The ASATI air
rotation system is a practice that has proven to be the best in
the industry and applied to all high occupancy facilities
engineered and constructed by ASATI. Each of the HVAC inflation
systems will be backed up with an automatic start up system to
generator electric for maintaining a safe operating facility at
all times should a site power failure develop.
√ Entrances into the dome
20
emergency exits will be provided to keep an access distance
between doors of no more the 100 feet apart to satisfy practices
accepted by code officials.
2
main entrance revolving doors will be place in line with interior
clubhouse for direct entrance to the management center for
controlling all team players and team supporters.
2
ADA
entrance and exiting doors will be adjacent to revolving door for
wheel chair entrance and exiting or for those who require
assistance.
1
truck airlock entrance for allowing long sporting systems to be
delivered or removed from the Sports Dome.
√ 10,000 square foot clubouse
The
clubhouse will contain the main reception and crowd control for
all players and game viewers.
Locker
rooms for boys/men and girls/women to change from street clothing
to sports uniforms and lockers for safe storage of clothing and
sports gear.
Food
court for sports drinks, water, and quick snacks including juice
bar.
Retail
stores for supplying general sporting gear to meet the needs of
the sporting activities within the Sports Dome.
A
quiet area to view the field sports and score boards on large high
definition TV’s while lounging in a quiet atmosphere.
Upper
deck grandstand full view watching of all the fields of your
choice and being part of the crowd noise and excitement generated
by the stadium crowd.
√ 12 full size training batting cages with
state of the art pitching machines and certified professional
trainers. The
batting cages will be centrally located to provide warm up
exercises and stretching out while waiting for ball players to
complete the games on the fields. This is a program to keep
players ready for improved playing and to avoid injury by going
onto the field without warm up.
√
Each baseball field will have a coach’s & team player box as
well as a field box with seating for each teams family supporters.
√
Each baseball field will have a electronic score board with remote
controls to keep scores updated from each coach’s box.
√
All of the baseball fields will be reached and entered by walking
around the fields perimeter through a corridor that is curtained
off from the playing fields. The divider corridor curtain provides
each field with privacy from distractions from the traffic of
other players and family supporters walking to their designated
playing fields. Each field’s private spectator’s box and team
players box will have numbered privacy doors for privacy control
for the players and spectators assigned to each of the 4 baseball
fields.
√
The 4 junior 180 ft. Baseball fields will be divided by safety
nets that will automatically be stored away when the 4 fields are
converted to two 230 ft. Fields. The two baseball fields will have
a diagonal divider net t divide the two 230 ft. Fields. On special
events, all curtains will automatically be lifted away and a full
size 360-foot single baseball field will be available for
professional play. All netting will be motorized for installing in
place and removed as needed.
√
The full size soccer field and lacrosse field will be pre-market
to convert into 4 junior size fields and have the same occupancy
capacity as the 4 junior baseball fields.
√
The soccer/lacrosse/multi-sports fields will be in full view by
all spectators from the 200 feet long second grandstand deck.
Back-to-back grandstand seating will allow spectators and fans to
watch over all the sports fields within the dome. Two executive
suits and press boxes for the soccer games and for the baseball
fields will be located
on the second deck for cablevision TV showing of special events.
√
Each soccer field will have scores for each of the fields recorded
on a master scoreboard with team names.
√
The total cable net air structure systems materials, engineering
and patents developed by Donato Fraioli incorporated into this
facility have been evaluated and recommended by Boca. ASATI cable
net structure exceeds the industries ASI-77 and ASCE air structure
design standards and safety factors. All fabrics meet NFPA 701 and
California Fire Marshall Code standards.
√
This total turnkey multi-Sports Dome facility will be manufactured
with all American made products including the total air structure
manufacturing and installation will be performed with American
labor by Air Structures American Technologies Inc ASATI.
|